Working with a clothing manufacturer in China can cut your production costs in half compared to sourcing domestically — but only if you know what to ask before you wire a deposit. We've run production for 500+ brands out of our own 50,000 sq ft facility in Guangzhou, and these are the ten things that actually separate a smooth first order from a nightmare one.
1. Ask for the real MOQ, not the headline number
Marketing pages love to advertise “MOQ from 1 piece” — in practice that usually means one piece per size, per color, from an existing blank, not one piece of a fully custom design. A factory that can genuinely produce a custom style at low volume will tell you the real number upfront: ours is 50 pieces per style(mixed sizes and colors), or 100 pieces for accessories. If a supplier won't give you a straight number in the first message, that's your answer.
2. Verify certifications instead of trusting a badge
ISO 9001 logos are easy to paste into a homepage footer. Ask for the certificate number and the issuing body, and check it independently — a legitimate factory won't hesitate. Same goes for third-party inspection: a manufacturer confident in its process will happily accommodate an SGS or Bureau Veritas inspection before shipment, because they're already running that level of QC internally.
3. Know what “500+ fabrics” actually means
A big fabric library sounds impressive until you realize it just means the factory can source anything from a middleman — with the markup and lead time that comes with it. Ask specifically which fabrics are stocked in-house versus sourced per order. Our library spans 200–500GSM French terry, ringspun cotton, and selvedge denim held on-site, which is what keeps sample turnaround fast. See the full breakdown on our fabric library page.
Not sure which fabric fits your design? Send us your spec and we'll recommend one.
Get A Free Quote4. Never skip the physical sample — even for a “simple” blank
Photos and tech packs hide fit issues, GSM discrepancies, and color drift that only show up in hand. Ask for a real sample lead time, not a vague “a few weeks.” A factory that runs its own cutting and sewing floor (rather than outsourcing samples to a separate workshop) should be able to turn one around in 7–12 days, with revisions included until it's right.
5. Ask exactly what “quality control” means to them
“We do QC” is not an answer. Ask for the actual checklist. Ours runs a 42-point inspectionacross eight stages — from raw material inspection on arrival, through in-line checks during sewing, to a final pre-shipment inspection before anything leaves the floor. If a supplier can't describe their process in that level of detail, they probably don't have one. More on our process on the manufacturing page.
6. Get clear on OEM, ODM, and private label before you brief them
These three terms change what you're actually paying for. OEM means you supply the design and the factory produces it. ODM means the factory develops the design for you, from an existing template or from scratch. Private label sits on top of either one — your labels, tags, and packaging on the finished product. Knowing which one you need before the first call saves both sides a lot of back-and-forth; our solutions page breaks down all three plus blank wholesale and startup programs.
7. Pin down lead times for samples and bulk separately
“Fast production” means nothing without a number attached to a specific product. Lead time varies by category more than most brands expect — a basic tee runs faster than a lined jacket or a pair of jeans. Ask for bulk lead time by category, not a blanket estimate: expect roughly 14 days for most styles and 21 days for hoodies, denim, outerwear, and dresses that need more finishing steps.
Tell us your product category and target quantity — we'll give you an exact timeline.
Get A Free Quote8. Ask whether shipping is DDP or FOB — the difference is thousands of dollars
FOB (Free On Board) means you handle customs clearance and duties on arrival — unpredictable if you've never imported before. DDP (Delivered Duty Paid) means the manufacturer handles customs, duties, and delivery to your door, for one all-in price. For a first order, DDP removes the biggest source of surprise costs. We ship DDP, DAP, or FOB to 60+ countries — ask your supplier which they actually offer, since not all factories can manage DDP paperwork themselves.
9. Be wary of a factory that won't say who's actually sewing your order
Plenty of “factories” are trading companies that quote you a price, then farm the actual production out to a third workshop you'll never see or vet. Ask directly: is this produced in your own facility? A supplier with nothing to hide will tell you exactly where your order is physically made — ours is a single 50,000 sq ft floor with 400+ in-house workers, not a network of subcontractors.
10. Test their responsiveness before you commit a single dollar
How a supplier communicates during the quote stage is the best predictor of how they'll communicate mid-production, when something inevitably needs a decision fast. Send a real question with real specs and time the reply. We commit to responding to every quote request within 24 business hours — if a supplier takes a week to answer a simple question now, expect the same during your production run.
Quick checklist before you send a deposit
- Got a specific MOQ number in writing, not a marketing headline
- Verified certifications independently
- Confirmed which fabrics are stocked in-house
- Received (and approved) a physical sample
- Asked for the exact QC checklist, not just "we do QC"
- Clarified OEM vs ODM vs private label for your specific order
- Got category-specific lead times for sample and bulk separately
- Confirmed DDP vs FOB shipping terms
- Confirmed the order is made in-house, not subcontracted
- Timed their response speed before committing
FAQ
What's a realistic MOQ for a new streetwear brand?
Most reliable factories set custom-design MOQs between 50–100 pieces per style. Anything advertised far below that is usually referring to blank, uncustomized stock.
How long should I budget from first sample to delivered bulk order?
Plan for roughly 3–5 weeks total: 7–12 days for sampling and revisions, then 14–21 days for bulk production depending on the product category, plus shipping time.
Is it normal for a factory to ask for a deposit before sampling?
Sample fees are standard and reasonable — it's a bulk-order deposit before you've seen a sample that should raise questions.
Ready to run this checklist against a real quote?
Send us your product idea, target quantity, and timeline — you'll get a straight answer on MOQ, sample lead time, and pricing within 24 business hours.
Get A Free Quote